Dayton 1TGP7 Provozní pokyny

Procházejte online nebo si stáhněte Provozní pokyny pro Zahradní nářadí Dayton 1TGP7. Dayton 1TGP7 Operating instructions Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 12
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
Form 5S5685
Printed in Korea
09663
0307/036/VCPVP
PIN018
03/07
Dayton
®
Propane
Patio Heaters
Operating Instructions & Parts Manual 1TGP7, 1TGP8 and 1TGP9
Please read and save these instructions. Read carefully before attempting to assemble, install, operate or maintain the product described.
Protect yourself and others by observing all safety information. Failure to comply with instructions could result in personal injury and/or
property damage! Retain instructions for future reference.
Description
This is a propane patio heater. It is intended for the heating of outdoor patios,
decks, spas, pool and open working areas. LP cylinder is not included.
1TGP7 Stainless Steel / Deluxe Propane LP Max 150 PSI, Min 5 PSI 11 inches W.C. 40,000 BTU/Hr
1TGP8 Copper / Deluxe Propane LP Max 150 PSI, Min 5 PSI 11 inches W.C. 40,000 BTU/Hr
1TGP9 Powder Coated Black / Deluxe Propane LP Max 150 PSI, Min 5 PSI 11 inches W.C. 40,000 BTU/Hr
Manifold
Model Finish / Head Design Fuel Supply Pressure Pressure Heat Output
Figure 2
- Dimensions
Model No. Length (Port/Suspnd) Width (Port/Suspnd) Height (
1TGP7 59 lbs 32 5/16” 7’4” (88”)
1TGP8 59 lbs 32 5/16” 7’4” (88”)
1TGP9 59 lbs 32 5/16” 7’4” (88”)
Model Unit Net Weight Diameter Height
Dimensions
Specifications
Figure 1 - 1TGP7 Stainless Steel
Deluxe Propane Patio Heater
H
D
Zobrazit stránku 0
1 2 3 4 5 6 ... 11 12

Shrnutí obsahu

Strany 1 - Patio Heaters

Form 5S5685Printed in Korea096630307/036/VCPVPPIN01803/07Dayton®Propane Patio HeatersOperating Instructions & Parts Manual 1TGP7, 1TGP8 and 1TGP9P

Strany 2

10NotesDayton Operating Instructions and Parts Manual1TGP7, 1TGP8 and 1TGP9

Strany 3 - Models 1TGP7, 1TGP8 and 1TGP9

11Dayton Operating Instructions and Parts ManualNotes1TGP7, 1TGP8 and 1TGP9

Strany 4

12Dayton Operating Instructions and Parts Manual1TGP7, 1TGP8 and 1TGP9LIMITED WARRANTYDAYTON ONE-YEAR LIMITED WARRANTY. DAYTON®PROPANE PATIO HEATERS C

Strany 5

2UnpackingRemove the heater and all of itspackaging materials form the shippingcarton.NOTE: Save the box and packagingmaterials for future use.General

Strany 6

3Features (Continued) AssemblyASSEMBLING THE HEATERTOOLS REQUIRED7/16” Wrench3/8” Open End WrenchAdjustable Opening Wrench, 8” LongPhillips Head Screw

Strany 7

4Dayton Operating Instructions and Parts ManualDayton®Propane Patio Heaters1TGP7, 1TGP8 and 1TGP9Figure 8 – Attaching reflector toreflector cap.Figure

Strany 8

5Operation (Continued)- If relighting a hot heater, wait atleast 5 minutes. See Figure 13 forspace tolerances.LIGHTING INSTRUCTIONS1) Turn the Contr

Strany 9

Dayton Operating Instructions and Parts Manual61TGP7, 1TGP8 and 1TGP9Operation (Continued)RELIGHTING1) Turn the Control Knob to the “OFF”position.2) W

Strany 10 - 1TGP7, 1TGP8 and 1TGP9

71TGP7, 1TGP8 and 1TGP9Dayton Operating Instructions and Parts ManualFor Repair Parts, call 1-800-323-062024 hours a day – 365 days a yearPlease provi

Strany 11

8Troubleshooting ChartSymptom Possible Cause(s) Corrective ActionDayton Operating Instructions and Parts ManualDayton®Propane Patio Heaters1TGP7, 1TGP

Strany 12 - Propane Patio Heaters

9Dayton Operating Instructions and Parts Manual1TGP7, 1TGP8 and 1TGP9Notes

Komentáře k této Příručce

Žádné komentáře